|
I think Gude's work depends on the mood fo the machinist on that day. I have a gude head in my room, that was modified to work better. So a gude base with more work... I feel okay with. I'll let you know once I have enough money to put it on fully built.
As far as cams, Crower should be done soon. They were waiting for the masters to begin production. I'll have more info when I call him next (probably next week). So that adds another set of grinds to your options.
Una salus victus.

Michael J. Kulaga e-mail: Michael_97RS@2gntDSM.zzn.com aol IM: MJKulga http://highlander.dsmpower.com/
All motor in the making.
Injen CAI, 55mm TB, P&P Intake Manifold, Hooker Header, GS-T Muffler, AFX UDP, S-AFC, 8.5mm Magnecor Wires, Crane Fireball HI-6DI2, SS Clutch Line, NRG Susp. Motor Mount Ins., FU/RU/RL STBs, TSW Blade 17x7.5, Bridgestone Potenza RE730, Front KVR Cross-Drilled Rotors & Carbon Fiber Pads
To Be Installed: P&P Milled Head, Rear Disc Brakes, Rear KVR Cross Drilled Rotors & Carbon Fiber Kevlar Pads, SS Brake Lines
Firefly: Mal: You don't know me, son, so let me put this to you plainly: If I ever kill you, you'll be awake. You'll be facing me. And you'll be armed.
|