|
lol, damn, that is pretty close to how I do it. I don't bother with drilling out the rubber. I just make enough of a hole for my sawzall. Then I sawzall two spots and air hammer it out. Also, for ease of installation, I grease up the prothane, just a little.
Captain Caveman
96 RS Turbo 11.414 @ 119.62 MSNS, Crower 2 NA cams, BW366, 10.5 comp, UDP, 60mm TB, W/A intercooler, 3.55 tranny 567.9whp 430tq 97 RS NA 13.188 @ 103.87 MSnS powered 12.5 comp, Crower 3's and 219.4whp with 175tq 98 RS DD 12.5 comp on stock ECU, LTH, Crower 2's, Koni, GC, Hypercoil, DG hats 99 OZ 5sp Stocker 15.856 @ 85.97 99 GS stocker auto 17.7@77mph!
wiki home page:http://www.2gnt.com/index.php?d=bullettdsm
|