Originally posted by CyexmasterOriginally posted by eclipse982nrRST Originally posted by AMM pricing is gonna be 700.00 shipped. i still gotta see what needs to be adjusted to fit the a/c and p/s though. mike
If you ran the wastegate on the other side, it should fit with ac and ps. Any finished pics yet sir?
Yes it should fit but maybe a tad shorter and pointing downward a bit. Also I noticed that the head flange has no space between ports, I think that should be added to leave a lil room for the thermal expansion of the material.